National Repository of Grey Literature 4 records found  Search took 0.00 seconds. 
Sanitation installation and gas installation in a apartment block with offices
Šťastný, Radek ; Vališ, Ivan (referee) ; Vrána, Jakub (advisor)
Bachelor´s work deals with sanitation installations and gas installation. In theoretical part deals with piper stuff and their history. Calculation part of work cover inner water installation, sewerage, gas pipeline and their connection to current network. Project was designed to current czech and europe regulations.
Study of wastewater management solutions for the village of Lhotka
Vojvodík, David ; Pumprlová Němcová, Miroslava (referee) ; Kriška-Dunajský, Michal (advisor)
The bachelor's thesis is focused on the processing and comparison of possible variants of sewerage in the Lhotka locality. It presents a proposal for three variants for improving the state of wastewater management in Lhotka. Option 1 envisages the design of a mechanicalbiological WWTP for sewage, with the proviso that the existing unified sewer will be used for rainwater drainage. Option 2 includes the design of an extensive type of wastewater treatment plant and the completion of the existing integrated sewerage system. The last variant 3 includes the pumping of wastewater by discharge to the Malenovice WWTP. The solution is in accordance with PRVKZK. An overview of economic demands is created for individual technological solutions. The aim is to determine the most suitable solution from an economic and technical point of view.
Study of wastewater management solutions for the village of Lhotka
Vojvodík, David ; Pumprlová Němcová, Miroslava (referee) ; Kriška-Dunajský, Michal (advisor)
The bachelor's thesis is focused on the processing and comparison of possible variants of sewerage in the Lhotka locality. It presents a proposal for three variants for improving the state of wastewater management in Lhotka. Option 1 envisages the design of a mechanicalbiological WWTP for sewage, with the proviso that the existing unified sewer will be used for rainwater drainage. Option 2 includes the design of an extensive type of wastewater treatment plant and the completion of the existing integrated sewerage system. The last variant 3 includes the pumping of wastewater by discharge to the Malenovice WWTP. The solution is in accordance with PRVKZK. An overview of economic demands is created for individual technological solutions. The aim is to determine the most suitable solution from an economic and technical point of view.
Sanitation installation and gas installation in a apartment block with offices
Šťastný, Radek ; Vališ, Ivan (referee) ; Vrána, Jakub (advisor)
Bachelor´s work deals with sanitation installations and gas installation. In theoretical part deals with piper stuff and their history. Calculation part of work cover inner water installation, sewerage, gas pipeline and their connection to current network. Project was designed to current czech and europe regulations.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.